The Engineering Field Report process gives CTA Engineering and the Preliminary Engineering Consultant the ability to digitally fill out, submit, and archive form F-EN-306 within e-Builder while conducting required activities for QP-EN-306. Should deficiencies or non-conformances arise in the inspection, the process also allows the engineering staff to notify the Construction Manager of the deficiency or non-conformance for tracking. As with all engineering field support activities, the project team must refer to QP-EN-306 for project team roles and responsibilities.
Benefits
- Accountability and transparency of identifying nonconformities and deficiencies
- Maintain project records from initiation to closure
- Reduce time completing form F-EN-306
- Provide tracking opportunities for data collected within this process, including time-to-completion
Read the Engineering Field Report guide here!