PURPOSE
The Contract Deliverable Review (CDR) process provides a structured approach for reviewing contractual deliverables across the planning, design, and construction phases of all project types within Capital and Non-Capital Infrastructure programs. Its objective is to ensure that all design submittals and contract deliverables are reviewed in a timely and consistent manner and meet Chicago Transit Authority (CTA) quality procedures, applicable standards, defined scope, and contractual requirements.
There are 4 (four) CDR process types: PCDR, DCDR, CCDR, and PGCDR and listed/linked below are their Guides, Permissions and Workflows.
Please note: Confidential documents should not be attached to this process.
TRAINING VIDEO
Please find the CDR Training video by clicking here
QUALITY ALERT:
For a detailed reference on reviewer dispositions, future deliverable carry over comments, comment logs tips click here
Preliminary Engineering Consultant CDR - PCDR
Click here for the PEC CDR Guide
Roles with process instance visibility include:
Folder Permissions – CTA Infrastructure & PgM
Folder Permissions – CTA
Folder Permissions – PEC
Folder Permissions – PEC Sub-Consultant
Folder Permissions – CM/OR
Designer of Record CDR - DCDR
Click here for the DoR CDR Guide
Roles with process instance visibility include:
Folder Permissions – CTA Infrastructure & PgM
Folder Permissions – CTA
Folder Permissions – DoR
Folder Permissions – DoR Sub-Consultant
Folder Permissions – CM/OR
Construction Manager/Owner's Representative CDR - CCDR
Click here for the CM/OR CDR Training Guide
Roles with process instance visibility include:
Folder Permissions – CTA Infrastructure & PgM
Folder Permissions – CTA
Folder Permissions – CM/OR
Program Management CDR - PGCDR
Click here for the PgM CDR Training Guide
Roles with process instance visibility include:
Folder Permissions – CTA Infrastructure & PgM
Folder Permissions – CTA